LOADING 6V PYRAMID
Draco-compressed GLB · 544 meshes · 7,682 nodes
INITIALIZING...
OCTAHEDRAL PYRAMID
6V · 48ft base · 51.8° · SolidWorks 2025
⬡ BILL OF MATERIALS · 6V OCTAHEDRAL PYRAMID · 48FT
— STRUCTURAL PIPES · 3 SIZES · Square Tube
Pyr-Pipe-1-SQ (Short)812×Primary strut
Pyr-Pipe-2-SQ (Medium)460×Secondary strut
Pyr-Pipe-3-SQ (Long)84×Tertiary strut
— CONNECTORS & HUBS
Octa-Connect-2.4m-Full128×Octahedral connector
Corner-Connect-2128×Corner node
Mid-Hub-SQ128×Mid-section hub
Tri-Core-Assem256×Triangular core
— NODE HARDWARE
End-Node-Pyr384×End node plate
Base-Node-PYR84×Base ring node
Mid-Node-PYR84×Mid-level node
— FASTENERS
M10 Bolt-Nut 50mm1,544×Primary fastener
M10/M12 Bolt+Washer1,152×Secondary fastener
3 pipe sizes · 1,356 total struts · ~640 connectors · ~2,696 fasteners
Material: 304 SS · 40×40mm SQ tube · Angle: 51.8° · 4 identical wall sections
$ PYRAMID COST · 48FT 6V · MATERIAL ESTIMATE
SQ Pipes (1,356)
$47,460
812+460+84 struts
Avg $35 · 40mm SQ SS
Connectors
$44,800
~640 × $70 avg
Octa / Corner / Mid
Fasteners
$8,088
~2,696 × $3 avg
M10 & M12 SS
Total
$100,348
Pipes 47% · Nodes 45%
Excl. labour
COST DISTRIBUTION
PIPES
47%
$47,460
NODES
45%
$44,800
BOLTS
8%
$8,088
Total · 6V Octahedral Pyramid · 48ft
Pipes + Connectors + Fasteners · Excl. labour / transport
$100,348
TURNKEY: +40–60% for labour, transport, anchors, cover ≈ $140k–$160k
MODEL6-V-Pyramid-48ft
BASE48 FT
ANGLE51.8°
FREQ6V
PIPE SIZES3
TOTAL PIPES1,356
CONNECTORS~640
MESHES544
FORMATGLB+DRACO
DRAGRotate
SCROLLZoom
R·DRAGPan
Spin